BAIC TOWER — CORPORATE PROPERTY PORTAL
TECHNICAL & ENGINEERING MATRIX

Technical Specifications & Building Infrastructure

All technical parameters are published strictly from Engineering source verification. Metrics undergoing audit display an official request status.

Core Building & Structure

3 Verified Parameters
Building Use & Property Identity
Key: building_classification
Commercial Office Tower (BAIC Tower)

Commercial office building property (distinct from automotive dealership operations).

✓ Business Owner / Publisher (Management) (business_owner@baictower.internal)Ref: BAIC Tower Master Brief & Guidelines.md
Facade & Curtain-Wall System
Key: facade_system
Reflective Steel-Slate Glass & Precast Concrete

Curtain-wall glazing engineered for balanced daylighting with dark anodized mullions.

✓ Business Owner / Publisher (Management) (business_owner@baictower.internal)Ref: Architectural Facade Reference Photo
Total Floors & Gross/Net Leasable Area (GFA/NLA)
Key: total_floors_count
SAMPLE / NOT VERIFIED — Available on Official Technical Sheet

Awaiting official as-built drawing sign-off by Head of Engineering.

✓ Business Owner / Publisher (Management) (business_owner@baictower.internal)Ref: Pending As-Built CAD Verification

Space & Fit-Out

1 Verified Parameters
Space Handover Conditions
Key: handover_conditions
Bare / Fitted / Furnished / Custom

Configurable per floor availability and commercial lease terms.

✓ Commercial & EngineeringRef: Leasing Handover Schedule

Vertical Transport (Elevators)

1 Verified Parameters
Passenger & Service Lift Zoning
Key: elevator_zoning
Dedicated Passenger & Service Lifts

Exact cab count and speed specifications provided in the Official Technical Sheet.

✓ Ir. Bambang Hartono (Engineering)Ref: Vertical Transport Spec Sheet (Pending Numeric Release)

Power & Mechanical (MEP)

1 Verified Parameters
HVAC & Electrical Distribution
Key: hvac_power_system
Centralized Commercial MEP Architecture

Detailed kVA capacity and generator backup ratings available upon verified request.

✓ Ir. Bambang Hartono (Engineering)Ref: MEP Master Schedule

IT & Telecom Connectivity

1 Verified Parameters
Fiber-Optic & Telecom Readiness
Key: telecom_fiber
Enterprise Riser & Dual-Path Fiber Ready (Verified-ENG-2026)

Active ISP carrier list confirmed during tenant technical fit-out.

✓ Building Engineering Reviewer (engineering.reviewer@baictower.internal)Ref: IT Riser Readiness Checklist

Parking & Vehicular Access

1 Verified Parameters
Vehicular Access, Drop-Off & Parking
Key: vehicular_dropoff
Dedicated Drop-Off & Structured Parking

Exact parking bay allocation pending operational audit release.

✓ Operations & EngineeringRef: Traffic & Parking SOP

Fire Protection & Life Safety

1 Verified Parameters
Fire Protection & Building Security
Key: life_safety_security
24/7 Security Monitoring & Life Safety

Equipped with lobby access control, common-area CCTV, and statutory egress routes.

✓ Engineering & OperationsRef: HSE & Security Manual

Sustainability & ESG

1 Verified Parameters
Green Building Certification & Energy Efficiency
Key: green_certification_status
Pending Official Certification Evidence

Withheld from public display until official certificate is uploaded and approved by Legal.

✓ Business Owner / Publisher (Management) (business_owner@baictower.internal)Ref: Pending ESG Certificate
FLOOR PLANS & TECHNICAL SHEETS (PUB-008)

Floor Plan Schematics & Engineering Documentation

Request Full Technical Pack
FP-TYP-MIDPUBLIC SCHEMATIC ALLOWED

Typical Mid-Zone Commercial Floor Schematic (Concept Study)

Typical floor plate layout study with central elevator core and perimeter curtain-wall daylighting.

RESTRICTED CAD / MEP VAULTLOCKED (NDA REQUIRED)

Detailed MEP & Structural CAD Drawings (Restricted)

Per PUB-008 security rules, restricted floor plan documents are filtered out at the server API layer for anonymous visitors.