BAIC TOWER — CORPORATE PROPERTY PORTAL
AUTHORIZED DOCUMENTS & VERIFIED FAQ (GEO READY)

Document Center & Frequently Asked Questions

Public Documents & Information Packs

DOC-TECH-001v1.0-Summary

Building Technical Specification Summary Sheet

Summary of approved architectural and building engineering parameters for prospective tenant evaluation.

Available via Engineering/Leasing RequestRequest Document
DOC-BROCHURE-001v1.0-Pending

BAIC Tower Corporate Leasing Brochure (Official Release Pending)

The official commercial brochure is undergoing final release approval. Submit a Leasing Proposal Request to receive the verified information pack directly from our Leasing team.

Pending Final PDF Sign-OffRequest Document

Verified Frequently Asked Questions (FAQ)

Is BAIC Tower a commercial office building or an automotive dealership?[GENERAL]

BAIC Tower is a commercial office building property within the JHL Group property portfolio offering corporate office spaces, business amenities, and building management services. This portal is the official property experience, not an automotive sales or dealership website.

How can we obtain rental rates and specific floor availability?[LEASING]

In accordance with BAIC Tower commercial policy, rental rates and commercial terms are provided via an official Leasing Proposal tailored to your required area (sqm), handover condition (Bare/Fitted/Custom), and lease tenure. Please submit a Proposal Request via the Leasing or Contact page.

Are online site visit requests automatically confirmed upon submission?[VISITS]

No. Every submitted site visit request enters 'Pending Review' status. Authorized BAIC Tower Reception and Leasing staff verify slot availability in Asia/Jakarta (WIB) time and confirm the appointment with you directly.

Why do certain technical specification metrics show 'Available upon verified request'?[SPECIFICATIONS]

We enforce a strict single-source-of-truth governance policy. Quantitative engineering metrics and detailed floor plans are disclosed publicly only after as-built source documentation is formally signed off by Building Engineering and Management.