leasing-insights•2026-11-08•BAIC Tower Commercial Leasing Team
Planning Your Corporate Office Fit-Out: Bare, Fitted & Custom Options

Selecting the appropriate office handover condition—from Bare Shell spaces offering complete architectural freedom to Fitted Suites enabling rapid operational deployment—requires early alignment between commercial leasing and building engineering teams.
Through BAIC Tower's leasing consultation desk, prospective tenants can request typical floor plate studies and technical fit-out guidelines tailored to their spatial requirements.
Verified by: Dimas Santoso (Leasing Manager)← Back to News Index